Friday, March 27, 2009

Legs and Feet for R2

Finally, I was able to get the outer legs, ankles and feet!!

YAHOO!! Not long now before R2 can stand up.

I still need several key pieces to connect to the shoulder motors, but I am getting closer!












I got the feet degreased and primed with white self-etching auto metal primer:



These holes in the steel feet will have to be expanded to accept the Knurled Hose Fittings:



I will be using a Step Bit to enlarge the holes while staying centered in the correct spot:



A 5/8" hole should do the trick:




I was able to squeeze in some work time last night - drilling out the pilot holes for the Knurled Hose Fittings in R2's feet. This is where the braided hoses that connect to the battery boxes will go.

It wasn't a great deal of work accomplished, but it felt good to work on him some as the weather is getting nicer!

I had to pick up a step bit to do the job right. $32 - OUCH!! But I have it in my toolbox for future uses as well, and it worked like a DREAM right through the steel foot casings:













I also picked up aluminum ankle details from a recent run.




The nice thing with these is that they have been made with a removable tab to allow easier painting. No masking with tape or latex!






Next on tap is the layered Shoulder Horseshoes for both legs!

These will be about 2 months in the making, but will be another step closer to completing the legs:

0 Comments:

Post a Comment

<< Home